Wenatchee Data Center | Wenatchee, WA

Project Details
- Data Centers
- |
- Energy
- |
- Temperature Control
- ATS Automation
Cooling the Data Center

Free Cooling Enabled
In 2015 ATS implemented facilityCARE, an ongoing commissioning and advanced analytics service to track equipment usage and highlight opportunities for operational improvement at the data center. SkySpark (www.skyfoundry.com) is used in the ongoing ATS facilityCARE service that includes monthly reviews and analysis by ATS engineers. As part of a facilityCARE review, ATS verified what facility operators had long suspected — the economizers were not functioning optimally. Using historical site data, ATS developed an estimate of savings based on the requirement that the facility use outside air for cooling when available. With data to back up the proposed changes, ATS was contracted to implement an energy conservation measure (ECM) to modify the economizer sequences so they function when outside air conditions are optimal for cooling. Without the facilityCARE service, this issue may have gone unaddressed since the plant appeared to be operating smoothly, experiencing no temperature issues and the facility engineers were focused on more immediate concerns.
Air-Side Economizer Savings
ATS implemented the updated economizer sequences in the fall of 2017. Now that the sequences are in place the data center has seen impressive savings over the first two months of operation. Over December 2017 and January 2018, the data center saw $22,500 in avoided cost for their data halls. Utilizing a baseline for comparison, the data center is expected to see a 24% reduction or 5.2 million kWh usage drop. The facility is also expected to save $137,000 in avoided utility cost over the first year of operations. 