Enatai Elementary | Bellevue, WA

Project Details
- Education
- |
- Energy
- |
- Temperature Control
- ATS Automation
Bellevue School District Modernization Plan

Unified Lighting and HVAC Control
BSD is determined to improve upon school designs with each facility replacement. When planning for the new Enatai, BSD decided their next improvement would be to house as many of their controlled systems under one platform as possible. Having worked with ATS Automation for many years, BSD was familiar with the environmental controls provided by the Alerton building management system (BMS) from their other schools. Once ATS demonstrated that they could efficiently control the HVAC equipment and also incorporate all the lighting into the same BMS, BSD chose ATS to provide the HVAC and lighting controls for the Enatai facility. By selecting one vendor, staff at Enatai have access to ATS’ expertise for both HVAC and lighting during the original installation and for long-term service. Now Enatai has one point of contact when it comes to the controls for their school — simplifying maintenance and operations. To integrate HVAC and lighting, ATS designed a system utilizing Alerton’s Compass BMS and Blue Ridge Technologies’ (BRT) lighting control platform. Alerton and BRT combined provide integrated lighting control without the use of proprietary gateways. Utilizing BACnet, BRT controllers are easily added to the Alerton BMS without needing any integration device. This solution allows BSD operators to use the same schedules for both HVAC equipment and lighting without the need to duplicate work in a separate lighting interface. ATS programmed a global schedule for lighting at Enatai in conjunction with BRT monitoring classrooms and common areas using occupancy sensors and photo cells. The sensors are used for daylight harvesting and turnoff or dim lighting according to lumen levels and whether the area is occupied or not. Classroom lighting control features a traditional on/off switch in the front of all classrooms, as well as a separate adjustment panel near the teachers’ desks.
Impact on Energy & Operations
By combining environmental and lighting controls, BSD has ensured that their high efficiency designs and equipment will continue to save the school money throughout the life of the building. “The strategy is that on day one the facility is already saving on utility bills,” said Jeff Tweeten, HVAC/Utilities Control Specialist for the Bellevue School District, “by saving on day one, the measured benefits are all about the efficiencies that directly impact the learning environment.” With integrated lighting, Jeff and his team can focus on what really matters — ensuring the learning environment is optimal for both students and teachers. The new Enatai Elementary nearly doubled the size of the original school to 87,500 square feet. The school opened to the public in September of 2016 with over 500 students attending class during the academic year. The school also received $135,013 in utility incentives by Puget Sound Energy (PSE) for exceeding local energy code efficiency requirements and standard practices during construction. In addition to lighting and environmental controls, the new Enatai elementary school features other energy efficient technology, such as geothermal heating and cooling, solar panels, heat recovery, AstroTurf, solar hot water loop and high efficiency sequences for mechanical equipment. Utilizing solar panels, Enatai recovers approximately 90,000 kWh per year. This harvested energy covers the majority of the school’s lighting cost for the year. Enatai’s energy use index (EUI) was also significantly improved from the previous facility. The school’s combined electric and natural gas EUI is currently 17 and is expected to decrease as system tuning continues. The national median source EUI for K-12 schools is 141. ATS, along with Alerton and BRT, help Enatai maintain optimal performance with rock solid building controls and sequences, along with occupancy-based lighting usage and daylight harvesting. For additional details read the entire case study detailing the work performed at Enatai Elementary. Download the full case study.