Allen Institute for Brain Science | Seattle, WA

Project Details
Category:
- Lab/Biotech
- |
- Temperature Control
Company:
- ATS Automation
Location:
Seattle, WA
Architect:
Perkins + Will
General Contractor:
GLY
Mechanical Contractor:
McKinstry
Major neuroscience research facility that consists of six stories and 245, 000 sq. ft. ATS installed Alerton controls on the AHUs and central utility plant plus Phoenix air valves were installed in the Critical Research spaces. Project was awarded LEED Gold.